| # | PROJECT No. | CUSTOMER / LOCATION | DESCRIPTION | MAN HOURS | YEAR - MONTH | GALLERY |
| 76 | 13-094 | Bapco - Bahrain | Catalyst skimming works for catalytic reactors (7811/21) @ Bapco SRU#2 | 7,500 | Jan-14 | |
| 77 | 13-133 | Bapco - Bahrain | Activated carbon change our carbon filter @ 1 ARU carbon filter B | 2,500 | Nov-13 | |
| 78 | 13-133 | Bapco - Bahrain | Activated carbon change our carbon filter @ 1 ARU carbon filter A | 2,500 | Nov-13 | |
| 79 | 13-110 | Saudi Aramco-Uthmaniyah gas plant - Afzco | Hydro jetting works for condenser @ Uthmaniyah Gas plant | 3,500 | Oct-13 | |
| 80 | 13-126 | Sasref-MSS - Jubail | HFO tank T-8204 (Roof underside, Rafter & girder) HP Jetting works | 3,500 | Oct-13 | |
| 81 | 13-115 | Bapco - Bahrain | Catalyst replacement works for Zinc Oxide drum | 6,500 | Oct-13 | |
| 82 | 13-098 | Arabian Chemical Terminals - Jubail | Tank (1-Hexane) cleaning for product swap (3 tanks) | 4,200 | Oct-13 | |
| 83 | 11-163 | Sasref - Jubail | Mixed aromatics Tank (8125) (14.63 m, H-16.46mt) isolation, Desludging, HP jetting, mixer maintenance, box up | 3,500 | Jan-13 | |
| 84 | 13-098 | Arabian Chemical Terminals - Jubail | Line (1-Hexane) cleaning for product swap | 4,200 | Oct-13 | |
| 85 | 13-010 | Arabian Chemical Terminals - Jubail | Di-ethanol amine tank cleaning for product swap (3 tanks) | 4,200 | Oct-13 | |
| 86 | 13-010 | Arabian Chemical Terminals - Jubail | Di-ethanol amine line cleaning for product swap | 4,200 | Oct-13 | |
| 87 | 13-013 | SASREF-SRU-3-JGC Intl - Jubail | SRU#3 Main burner / reaction chamber modifications incl. another welding, NDT & unit spading (de) works | 3,500 | Oct-13 | |
| 88 | 13-073 | Saudi Aramco- Hawiyah NGL - Afzco | Catalyst handling works for feed gas de-hydrator (unit-1/2/3) | 3,500 | Sep-13 | |
| 89 | 11-163 | Sasref - Jubail | Wet Slops Tank (9632) (10.67 mt. H-9.14 m) isolation, Desludging, HP jetting,equalizer line modification, box up | 5,000 | Sep-13 | |
| 90 | 11-163 | Sasref - Jubail | Low sulphur gas oil Tank (8139) (19.51 mt. H-16.46 m) isolation, Desludging, HP jetting, drain line modification, weld build up works, box up | 2,500 | Aug-13 | |
| 91 | 13-073 | Saudi Aramco-Hawiyah HNGL - Afzco | Catalyst replacement works for feed gas dehydrator | 2,500 | June-13 | |
| 92 | 13-034 | Saudi Aramco-Berry-Afzco- - Jubail | Catalyst change out works for sulphur converters-@ different trains | 4,500 | June-13 | |
| 93 | 13-013 | SASREF-SRU-3-JGC Intl - Jubail | SRU#3 Main burner/ mixing chamber modifications incl. patch plate, nozzle installation,anchor installation & touch up painting works, Unit spading (de) | 6,200 | May-13 | |
| 94 | 11-163 | Sasref - Jubail | Wet Slops Tank(9633) (10.67 mt. H-9.14 m) isolation, Desludging, HP jetting, drain line modification, weld build up works, box up | 5,000 | Apr-13 | |
| 95 | 13-028 | SASREF-SRU-2 - Jubail | Catalyst Unloading & Reloading works for SRU #2 reactor (R-5201) | 2,500 | March-13 | |
| 96 | 12-123 | SABIC-IBN ZAHR-TGC - Jubail | Concrete (550 mm thick slab, 5.3 m*1.5 m) cutting by using High pressure water jet | 7,500 | March-13 | |
| 97 | 12-093 | Bapco - Bahrain | Catalyst vacuuming works for FCCU during 2013 T & I | 25,000 | Feb-13 | |
| 98 | 11-163 | Sasref - Jubail | Sour water storage tank (5401) (17.27 m, H-10.97 m) isolation, Desludging, HP jetting, box up | 2,900 | Feb-13 | |
| 99 | 12-067 | Sasref - Jubail | Heavy fuel oil Tank (8203) (60.96 m, H-21.95 m) annular plates & Roof replacement works, tank hydro testing | 75,000 | Feb-13 | |
| 100 | 12-131 | Bapco - Bahrain | Calgon activated charcoal replacement works for OGTU carbon filter | 2,500 | Jan-13 |